132 Avenue Renewal

132 Avenue between Fort Road and 127 Street is undergoing a renewal process, with construction anticipated to start in 2023. This corridor is a critical missing link identified in the Bike Plan,

Three options for cycling infrastructure are proposed in the 132 Ave biking information package, and you can provide your feedback on the options until Thursday, May 20.

Join the biking discussion on Engaged Edmonton to leave your comments and ideas.

You can also complete the online survey and leave comments about driving, traffic calming, walking, parking, and gathering spaces on the full engagement page.

Our preference is the protected roadway-level bike lane, similar to the downtown network. A shared pathway may have potential as well: a preferred option between the two will be dependent on specific design considerations and tradeoffs, details which haven’t been planned at this phase. If you are familiar with specific locations along 132 Ave where one option would be the clear choice, please provide that feedback to the City, and let us know as well.

The raised bike path option is not preferred as maintenance and design issues mean raised bike paths often fail to function well year-round.

As part of collector renewal process, the new design of 132 Ave will emphasize the following principles:

  • Create spaces along 132 Avenue that offer safe transportation pathways for all users

  • Enhance the community by creating beautiful spaces along 132 Avenue

  • Invest in infrastructure improvements that will create a more positive experience for all users of 132 Avenue and foster the maintenance and development of great local destinations, both businesses and recreational opportunities

  • Prioritize the safety of children at the many schools along 132 Avenue and those living in the communities along 132 Avenue

Full details, and registration for the upcoming online engagement sessions are available on the project website.